Leave a Message
Thank you for your message. We will be in touch with you shortly.
Explore Our Properties
Sunlit red-brick home entry with a cream portico, slate-blue shutters, worn concrete steps and an oakleaf hydrangea bed.

Lakeshore Park Has Moved From Building to Caretaking, and Rocky Hill Gets the Benefit

October 8, 2026

"My job is to protect it."

Simon Bradbury said that in a May 28, 2026 announcement naming him CEO executive director of the Lakeshore Park Conservancy. It's a short sentence about a park that has been under construction for most of the past decade. A Knox News "Positively East TN" piece in April 2026 opened by calling the park "the scene of seemingly constant construction," with users "constantly wondering what is over the horizon."

For anyone in Rocky Hill who heads east on Northshore Drive for a loop, a pickleball game or a playground stop, the useful news is this. The big building projects at Lakeshore are behind it. What remains is smaller work: walkways, restrooms, parking and roads. The person now running the park describes the job as protecting it, not growing it. That change shows up in three places this fall: the construction you can still see, the people in charge, and the calendar.

The big projects already happened

The large Lakeshore projects people point to are already done. The Conservancy says it finished Phase 2, Part 1 of the park's master plan in fall 2024. That phase added the Jim Haslam Sports Center, six pickleball courts, Pryse Pavilion & Gardens, Tower Playground & Pavilion, the McCamy Family Adult Fitness Center, and updates to trails, parking lots and sidewalks across the park.

All of that came out of a master plan written in 2020 after three months of public input. WBIR reported that the Knoxville City Council approved the plan that same year.

The current phase is a different kind of project. It started in fall 2025, and the park lists four parts: road and parking improvements, a pavilion with restrooms at the administration building, new office space for the Conservancy, and a terrace between Marble Hall and Marble Pavilion. None of those adds a new way to play. They make the park easier to get around and easier to host events in.

WBIR's description of the terrace makes that clear. The terrace replaces a pathway the station called "usually heavily trafficked and muddy" with a "safe and durable" walkway, and it expands event capacity between the two buildings. The same report lists the rest: repaving the road next to Marble Hall, repairing its storm drains, and adding sidewalks along that road so people walking through the park have a safer route.

What's open and what's still underway

The terrace is the piece with the clearest sign it's open. The park's venue rate schedule lists "Marble Hall, Pavilion, & Terrace" as a rental package, effective March 1, 2026. That matches Knox News, which reported on Jan. 22, 2026 that the paved terrace was expected that spring.

For the other pieces, the public record is thinner. Here is what can be confirmed:

  • Marble Hall–Marble Pavilion terrace. Listed as a rental package since March 1, 2026.
  • Restroom pavilion with covered seating. WBIR described it as underway next to a new parking lot near the Old Lakeshore Administration Building. No later dated report confirms it has opened.
  • The lot behind the administration building. In January, Knox News reported that the gravel lot was being paved and that restrooms and seating were planned.
  • Roads leading to the administration building. WBIR said repaving would start in January.
  • New Conservancy office space. It's on the park's list for this phase, with no published completion date.

The day-to-day detail that matters most is parking at the HGTV Overlook. The park's venue page still says construction will limit parking access there "March through November." The new lot near the administration building is meant to give more accessible parking for both the Parks and Recreation offices and the Overlook. Until the work around it is done, parking near the Overlook will be tighter than it will be once the lot is finished.

The April Knox News headline said the work was "wrapping up in time for summer." The full article isn't publicly available, so the safest reading for October is this. The terrace is done. The rest is in its final stretch. The park still warns about parking at the Overlook.

No next build has been announced

Older drawings for Lakeshore have shown much bigger ideas. A design firm's long-range concept showed more river access, a kayak launch, boardwalk access, and turning the former chapel into "Lakeshore Hall." That page is dated 2014, and none of those ideas has a current schedule.

The Conservancy's own "Future Developments" section describes the current phase and doesn't announce a Phase 3 or a timeline for anything after it. For now, nothing big is next in line. A river launch or a reused chapel may come someday, but no one has put a date on either.

That's why the leadership change matters more than an ordinary staff announcement. Bradbury replaces Julieanne Foy, the longtime executive director who planned to retire later this summer. He comes in after running parks and recreation for the Tellico Village Homeowners Association in Loudon for ten years. Before that he was assistant director of parks and recreation for the City of Pigeon Forge. He is also a U.S. Navy veteran and has worked in management at a whitewater rafting operation and at Court South Total Conditioning Clubs.

Dee Haslam, who chairs the Conservancy board and led the search committee, described his job in terms of programming and upkeep. She said his leadership would "help expand our programs, strengthen community connections, and maintain the beauty of our park." Bradbury called Lakeshore "an absolute gem" and said that, besides preserving the land, "it provides a wide variety of forms of recreation."

The park itself is owned by the City of Knoxville, which the announcement places in the Bearden area of west Knoxville. The Conservancy runs its operations. The current construction is paid for with donations to the Conservancy, in partnership with the City.

The calendar is filling in

A park that has finished its big projects shows its next stage through events, and Lakeshore's fall and holiday schedule is already built around spaces that exist today.

On Thursday, Oct. 15, 2026, InterFaith Health Center holds "An Evening Under the Stars" at the Lakeshore Park Amphitheater from 6 to 9 p.m. The evening includes dinner, drinks and an acoustic set by country artist Matt Stillwell. The amphitheater was finished before this phase began. The park describes it as three tiers of grass and concrete seating around a 50-foot circular stage.

Then comes Light Up Lakeshore, from Nov. 29, 2026 through Jan. 1, 2027. Its holiday market takes over the HGTV Overlook on Saturday, Dec. 5, from 3 to 7 p.m., with local makers, businesses, food trucks and nonprofits. The park describes the Overlook as a 500-foot esplanade with a marble central plaza, lined with black gum trees and string lights.

Dec. 5 has two events on Northshore Drive

Dec. 5 is also the date the Rocky Hill Business District lists for its own Christmas Parade and Festival. The two schedules fit together in one afternoon and evening:

Time Where What
3:00 p.m. HGTV Overlook, Lakeshore Park Light Up Lakeshore holiday market opens
3:30 p.m. Rocky Hill Center, 7513 S. Northshore Drive Rocky Hill holiday market begins
6:00 p.m. S. Northshore Drive Rocky Hill Christmas Parade steps off
7:00 p.m. HGTV Overlook, Lakeshore Park Light Up Lakeshore market closes

The overlap is real, so plan the order ahead. The Rocky Hill market and the Lakeshore market both run through the late afternoon. The parade starts an hour before the Overlook market closes. If you start early at Lakeshore, you can get back to Rocky Hill Center before the parade. If you start in Rocky Hill, the Overlook will still be lit after the parade, since Light Up Lakeshore runs nightly into the new year. Either way, plan for Overlook parking to be tight. The park's venue page warns of construction limits through November, and the new lot is meant to ease them once it's finished.

Owning a home near a park this size means paying attention to what happens there. A finished terrace, a lot that is still being paved, and a new director focused on upkeep all affect how the park feels on an ordinary Tuesday. Over time, they also affect how buyers see the homes along Northshore. If you're thinking about how changes like these play into the value of your Rocky Hill home, Ashley Wade can walk through it with you, from the condition of your house to the comps up and down Northshore. Request your bespoke consultation.

Follow Us On Instagram